National Energy Board recently held a wind energy industry standardization meeting, the full launch of wind power industry-standard building, the establishment and improvement of wind power equipment standards, product testing and certification system.
Currently, wind energy industry standards for construction leading group, the CGE and the Standardization Technical Committee has been established. Leading group to study the development of wind power in China's policy of building standards, review criteria to determine wind power system planning, coordination to resolve the standard of the major issues in the preparation process. Expert Advisory Group to study the major issues of wind power standards, provide policy advice to the leading group for the wind power standard system for top-level design and implementation of annual work plans and projects to provide technical advice. Standardization Technical Committee is responsible for wind farm planning, construction and installation, operation and maintenance, and network management as well as wind power machinery equipment, electrical equipment, professional standardization.
It is reported that the National Energy Board has developed a "wind power standard system framework (draft)." This system is confirmed, will become the standard construction of wind power a programmatic document.
Wind power is an important strategic emerging industries. 2009, China's wind power installed capacity reached 22.68 million kilowatts, to achieve double the growth for 4 years, jumping to third in the world. Windmill power equipment manufacturing innovation has made significant progress, mastered MW wind turbine manufacturing technology, 1.5 MW wind turbine localization rate to 86%, 3 MW unit has been installed to run, emerged into the world system products ability of the top ten of China Rui, gold wind, steam and other leading enterprises in the East.
With the rapid development of China's wind power industry, the emergence of wind power equipment investment herd phenomenon, the phenomenon of repeated introduction and construction. The current wind power equipment manufacturing enterprises in China more than 80, showing wind signs of excess capacity, if not timely regulation and guidance, excess capacity would be inevitable. To this end, the Energy Bureau decided to accelerate the construction of wind power standard system, improve the market access threshold, standard wind power equipment market order.
Speed up the standard construction of wind power Wind Power will be difficult to solve the current outstanding problems such as play an important role. Wind power standard construction, wind generators farms will be development, construction, operation and maintenance, and equipment selection for wind power, wind power prediction will have a positive norms and guide, helping improve the power grid on the acceptance of wind power capacity To create conditions for large-scale development of wind power.















Subscribe My BLOG(RSS)