Anhui around "eco-home" building project in recent years to the promotion and popularization of wind power as a Waste Management initiatives. Up to now, the county has installed a small wind generator set 120, power generation capacity of 270,000 kwh.
Since the county is located in Jianghuai back, all the year round by the southern and northern monsoon influence of wind power to provide favorable conditions. To make this technology as early as universal, as early as the effect, as early as Huinong, the county dedicated to promoting wind power generation into the new era of new energy sources in rural areas the main contents of the building.and rural energy service center personnel in the organization of villages and peasant households, door-to-door publicity, face-to-face lectures enhance awareness and participation rate of the masses at the same time, take the initiative to assume responsibility in charge of project construction, in the technical guidance, equipment installation, material procurement , scientific use, management, maintenance, etc., in order to benefit from the building to provide full tracking service units and to take "personnel division of responsibility to the film, the responsibility to the people" and so on, the construction of the project strictly to the construction of a benefit party.
In accordance with the "model guidance, the overall radiation" principle, this county and other towns in the township is scheduled to choose a model point, the basis of success through organized spot, to observe, such as forms of conduct to guide the masses. At the same time, the county's spirit of "equal emphasis on construction and management" principle, combined with the gradual establishment of the actual sound of the grass-roots network of services, timely training of technical personnel to enhance the service network to improve the grass-roots level of integrated services to promote the universal promotion of wind power.















Subscribe My BLOG(RSS)