Small-scale wind turbine installation at a hundred-watt-class fans and fan kW-class installation. A hundred-watt-class fans as a result of the structure of small, light weight also, in general people will be able to put up 3-5. KW-class fans as a result of a greater weight of the structure, installation required lifting winch and pulley. In order to work safely installed smoothly, the following special technology to develop a point of order.
(1) the installation of tower used by the Chinese fir, with a firm texture. The strength to rope in line with the requirements of the safety factor must be large, its length must have the appropriate margin. Lifting operation should be provided that the signal so that a unified command.
(2) of the main wind turbine components to install (such as lifting parts and components, etc.) to obey the unified command. Operators are not allowed to stand under the tower or are in the process of lifting the following components in order to prevent accidents.
(3) on top of the tower is installed, the operator must wear a seatbelt or install other protective devices. In addition, not in the hands or body parts or tools to carry in order to avoid inadvertently falling and injuring people or causing damage to the upper tower operators by the use of tools and spare parts, should be unified by hanging on the ropes.
(4) the installation of wind turbines, wind speed can only be no more than 4m / s (three-level wind) conditions in order to ensure the safe operation.
(5) by lifting winch, should be put up around a circle to evenly coiled, or outer ring rope travel down easily from the inner ring, with the result that the whereabouts of all of a sudden things hanging. Lifting rope around the disk around, not to distort the vertical rope, rope distortion because, first, through the pulley when it is not easy through the second, lower tensile strength.
(6) the installation of wind round, prior to the wind with a rope round of the blade firmly tied to a tower body, so as not to wind round the wind was moving and rotating the installation of bumps operators.
(7) wind turbine is installed and check for accurate, can test run. Pre-commissioning, the tower must be down and leave the tower in order to avoid changes in wind direction, wind or wheel spin accidents.